GERMANY: Energy from wastewater sludge

modern wastewater treatment and biogas production
modern wastewater treatment and biogas production

Location : Munich / Gut Großlappen, Germany


Project fact file
  • One of the most modern wastewater treatment plants in Europe
  • Biogas production since 2008
  • Digester plant with four 45 meter high digestion towers
Product list
  • Knife Gate Valves ERU K1 (DN50 – 600)
  • Butterfly Valves ECLS (DN50 – 400)
  • Butterfly Valves ROCO Premium (DN80 – 600)
  • Gate Valves (DN40 – 350)
  • SWING Check Valves (DN50 – 250)
  • Butterfly Valves EAK (DN700 – 1800)
  • Check Valves ERK (DN350)
  • Knife Gate Valves ECO (DN100 – 200)
Back

Key figures

References

Vacancies

Show all